Case Studies

GeoEnvironmental

St Mary’s Substation, MRI, ManchesterPhase I and Phase II site investigation for new build electrical substation

Wilton Way, London – Phase I preliminary site investigation and subsequent Phase II site investigation for new build residential development

Alkrington Visitors Centre, Middleton – Phase I site investigation for new build visitors centre at country park

Johnstone Street, Blackburn – Phase I site investigation for new build residential development

Winnington Road, Marple – Phase I preliminary site investigation for new build residential development

91 Southgate Road, London – Phase I and Phase II site investigation for new build residential development

95-99 Southgate Road, London – Phase I and Phase II site investigation for new build residential development

Canal Side, High Lane
– Phase I site investigation for new build residential development

Bolton BSF Schools – Batch of Phase I site investigations for new build schools

Leeds Schools – Batch of Phase I site investigations for new build schools

Sefton BSF Schools – Batch of Phase I site investigations for new build schools

Former Tannery, Dolgellau – Phase I and Phase II site investigation for new build residential development

Geotechnical

Nottingham Phase II Tram Line, Nottingham – Geotechnical Investigation along proposed tram route

Gwynt-y-Mor Wind Farm, St Asaph – Geotechnical Investigation along the proposed cable route from a large scale off shore wind farm arriving on shore at Abergele and continuing inland to St Asaph

Barkby Beach, Prestatyn – Geotechnical Investigation along existing sea defences for a proposed cable route location.

Meadows Avenue, Thornton – Geotechnical Investigation for new build residential bungalow on very soft estuarine deposits

Middleton Wind Farm, nr Kilmarnock
– Geotechnical Investigation for new wind farm comprising six wind turbines, one anemometer mast and two proposed borrow pits

Earls Hall Wind Farm, Clacton-on-Sea
– Geotechnical Investigation for new wind farm comprising five turbines, access road and anemometer mast

Sandbrook Park, Rochdale – Geotechnical Investigation for proposed retaining wall

177 Marsland Road, Sale – Geotechnical Investigation on former petrol station for new build MOT centre

The Dell, Cuddington – Geotechnical Investigation on existing residential development for new build extension